Filter by
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Modular school Containers
Education
Press

Modular School Space for Swiss Municipalities

Swiss municipalities facing school space shortages must choose between renting, buying or sourcing second-hand modular classrooms, each with different cost, timeline and compliance implications. This guide covers procurement models, barrier-free requirements under BehiG and SIA 500, second-hand due diligence, and realistic project timelines for container-based school extensions.

Lara Koch
06 August 2026
Housing
Press

How Fast can Emergency Accommodation be installed?

Manufacturer spec sheets quote assembly times, but the real deployment timeline for emergency accommodation depends on coordination, logistics, site readiness, and permits. This article maps the full decision-to-occupancy chain so you can plan realistically and avoid the bottlenecks that delay most projects.

Lara Koch
05 August 2026
Foldable Event Containers
Events
Press

Foldable Containers at Events:

Foldable containers collapse to a fraction of their transport volume, allowing more units per truck and faster on-site erection without cranes. This article explains the mechanics, quantifies the logistics savings, and covers how to choose the right foldable system for deadline-driven event infrastructure.

Jonas Weber
21 July 2026
Modular Healthcare facilities
Healthcare
Press

Planning a Modular Healthcare Facility

This guide walks healthcare planners through the process of delivering a modular clinic or treatment facility, from defining clinical zoning and infection control requirements to setting realistic timelines and choosing an ownership model. It addresses the operational and regulatory detail that generic modular construction content consistently overlooks.

Jonas Weber
21 July 2026
event container
Events
Press

Container Cafe Deployment

This article breaks down realistic deployment speeds for container cafes and container bars, comparing foldable flat-pack systems, pre-fitted modular units, and bespoke builds. It covers the compliance, logistics, and commercial decisions event organisers need to make when the timeline is non-negotiable.

Jonas Weber
20 July 2026
Modular Construction
Press

Modular Construction Timelines in Switzerland

This article breaks down each phase of a modular construction project in Switzerland, from requirements and permitting through fabrication, delivery, and handover, with realistic durations. It covers Swiss permit procedures, parallel workflow advantages, common delay factors, and indicative timelines for schools, events, housing, and industrial use cases.

Jonas Weber
08 May 2026
Housing
Press

Your Project Has a Timeline: Match It to the Right Modular System

The choice between temporary and permanent modular buildings depends on your project's duration, regulatory context, financial model and end-of-life plan, not on the structure's physical capability. This article provides a five-factor decision framework to help you identify the right modular approach, or combination, for your operational reality.

Lara Koch
24 June 2026
Commercial
Press

Pre-Owned Modular Buildings

Pre-owned modular buildings offer 20 to 40 percent cost savings, significantly lower embodied carbon, and lead times measured in weeks rather than months. This guide explains what refurbishment involves, what to evaluate before committing, and how to choose the right acquisition model for your project.

Lara Koch
05 February 2026
Modular Construction
Press

Foundation Options for Modular Buildings

The foundation beneath a modular building determines structural safety, installation speed, and whether the facility can be relocated later. This guide explains how to match foundation type to use case, project duration, and site conditions so you avoid costly mismatches.

Jonas Weber
03 July 2026
Events
Press

Modular Infrastructure at Events

Events operate under constraints that conventional construction cannot meet: immovable deadlines, greenfield sites, and the need to commission entire operational environments in days. This article explains the operational logic behind modular container-based infrastructure for festivals and large events, covering deployment speed, the full infrastructure stack, financial models, premium quality, and the hidden cost of multi-supplier coordination.

Jonas Weber
03 July 2026
Events
Press

Relocate, Reconfigure, Reuse

Modular container-based buildings are designed to be moved, expanded and repurposed, but only if you plan for it. This guide covers the relocation process, reconfiguration options, practical limits and how to build future flexibility into your first procurement decision.

Lara Koch
18 May 2026
Commercial
Press

Modular Healthcare Construction

This guide explains how modular construction is used across the healthcare spectrum, from temporary surge facilities to permanent clinics, covering compliance pathways, realistic timelines, cost drivers, and honest limitations. It is written for healthcare facility planners and estates managers evaluating modular as a credible infrastructure option.

Lara Koch
03 July 2026
Modular Construction
Press

How Quiet Is a Modular Building?

Acoustic performance in modular buildings depends on system design, material specification, and project coordination, not the construction method itself. This article explains the physics, the materials, and the performance targets you need to specify for schools, housing, offices, and other occupied facilities.

Lara Koch
09 June 2026
Modular Construction
Press

How Modular Construction Compresses Timelines

Modular construction can deliver finished buildings 30 to 50 percent faster than conventional methods, but the speed claim is rarely explained in detail. This article breaks down the specific mechanisms, from parallel workstreams and factory production to procurement compression and regulatory pre-certification, and examines what that time saving means in practice for project budgets and operational readiness.

Jonas Weber
03 July 2026
Modular Construction
Press

Rent, Lease or Buy Modules

This guide explains the four main ways to acquire modular buildings, from outright purchase and rental to leasing and buyback, with practical criteria for choosing between them. It covers how to match the financial model to your use case, timeline and budget structure so that infrastructure is funded sensibly, not deferred.

Lara Koch
10 February 2026
Housing
Press

Can You Get a Modular Homes Mortgage?

Getting a mortgage on a modular home is achievable but requires more preparation than a conventional property purchase. This guide explains what lenders look for, the types of finance available, and how to make your modular home mortgage-ready from the outset.

Lara Koch
02 December 2025
No Results Found

Select another filter

HEPF Partners

Book a free consultation

Open, non-binding and tailored to your project.